top of page
IMG_2016.JPG

Osprey designs and fabricates custom furniture and architectural elements built to last generations. Each project begins with the material itself: its origin, its character, and its full life cycle. We work with natural defects rather than discarding them, favor traditional joinery that can be repaired rather than replaced, and use finishes like yakisugi that protect wood without chemical treatment. Projects are developed with architects, designers, and builders as integrated scopes, fabricated in sequence and installed as a single architectural effort, so that every piece serves the space and the materials it came from.

IMG_2099.JPG
IMG_2053.JPG

Monolithic dining scope (Claro walnut and blackened steel) — custom residence

IMG_2009.JPG
IMG_1990.JPG
IMG_2026.JPG

Stone and wood concept (Locally-sourced granite and sustainably sourced teak) — site-responsive architectural element

IMG_0141 2.JPG
IMG_6191 2.HEIC

Suspended architectural ceiling cloud (reclaimed barnwood and low-voc white paint)

Screenshot 2026-04-29 at 7.42.07 AM.png
Screenshot 2026-04-29 at 7.41.55 AM.png

(In production) Aspen Total Automotive slat wall (white oak and stainless steel, 16'x12')

Signature Work

These works explore material behavior, proportion, and process. While developed independently, several pieces may be placed privately or serve as the basis for future commissioned work.

IMG_1693.JPG
IMG_1715.JPG
IMG_1734.JPG

Balance — Stone & Yakisugi

IMG_1816.JPG
IMG_1813.JPG
IMG_1821.JPG

Minimalist restraint - steel and reclaimed wood

Screenshot 2026-05-28 at 8.21.10 PM.png
Screenshot 2026-05-28 at 8.20.21 PM.png

(In-production) Buckhorn Public Arts x Aspen Ski Co. "Reimagine a Chair" Project (White oak and stainless steel)

Process

Every project begins with a paid design phase, where the most consequential decisions are made: where materials come from, how pieces are joined, and how they will age, be repaired, or be reused. Fabrication follows in sequence, working with each material's natural character rather than against it. Installation is coordinated with the broader project team, with logistics planned in advance to reduce waste, rework, and unnecessary transport.

bottom of page